industrial training report for electrical engineering students

Do not immerse any part of equipment in liquid. The students themselves can infuse the spirit of productivity to the challenges and obstacles that lie ahead. Figure 4.7.1 Suresign VS4 monitor 304.7.2 Vital Sign 4 monitor label function. arranged paths, His blesses, and noble peoples He introduced along from the start to the I had follow Ms Athirah to do corrective maintenance for the bedside guide rail at the ward. In this position, I was placed in the Department ofBiomedical Services (BEMS). It is going to contain your basic information, such as: Your Passport. Enter the valuein the keypad and touch OK. After that, touch the apply button to save thechanges and the menu.Adjusting the alarm volume.Open the alarm menu and touch the alarm tone volume options. With selections of three test loads, protectiveearth test currents, and two insulation test voltages this versatile product can be usedworldwide to test to their standard of choice. 5, pp. By using our site, you agree to our collection of information through the use of cookies. end of the industrial training. Enter the email address you signed up with and we'll email you a reset link. (Electrical Engineering) It also can add and expand technical knowledge and skills of the student, if the student has previously acquired knowledge is limited, but when students attend this training, students can find out more about things, and when something will work. -1)Delivering lectures of Electrical Engineering to polytechnic students. Enter the email address you signed up with and we'll email you a reset link. Industry training is important because such training can expose students to the real working environment. Enter the value in the numeric keypad and touch OK. Press the mainscreen key button to close the menu.Silencing alarm.To silence a continuous alarm for 60 seconds, press the alarm silence key once.For silence a continuous alarm, press alarm silence key once. Figure 25: Ground station for street lamps Error! During this training, I was given the opportunity tofollow the learning involved technical assistance related. En Firzi as the Biomed Engineer had give the explanation about the Biomedical Trainee Manual to me. Sample report. The main purpose of this training was to expose students to the real working environment when the students out of the polytechnic later. f) Linking theory to practice and so on. faculty of electrical engineering universiti teknologi mara. 21WEEK 13 ( 31 MAY 2021 5 JUNE 2021)I had change the cot side rail with biomed technician Ms Aina, the LKL cot side railare broken maybe cause of the long-life span, so we had change it to the new to avoidthe patient from falling down during laying on the bed. Suspect the motor had problem and needs to troubleshoot. Silence all alarms indefinitely-audio off mode, pressalarm silence key for two second.Enabling print on alarm.Open the alarm menu and touch the print on alarm check box to select thedesired setting. The facility includes. Figure 43: Close-up of Nikkon LED light fittings . 37. service, site visit with their supervisor, and etcetera. The students industrial works experience scheme (SIWES) programme is a manpower development geared toward acquiring to attain sustainable development, bility and higher rate of productivity in the organization. So quite easy and convenient to carry out the work which will be given later. It owns 38.7% of KPJ,according to data compiled by Bloomberg. Green Free access to premium services like Tuneln, Mubi and more. I am passionate about engineering, research, entrepreneurship and using my skills to solve challenges faced on the African continent. It is because the department must bestandby their equipment for cases. Experience: Over 30 years of exceptionally diverse . Do not allow liquid enter the case. A REPORT OF SIX MONTHS INDUSTRIAL TRAINING (14 PT.) The industrial attachment report should follow this format. I had attend to the maintenance department and in charge by Ms Athirah and Ms Aina who is the biomed staff at the KPJ JOHOR. To disinfecting the monitor dampen a soft cloth with any disinfection solutions like isopropyl alcohol, hydrogen peroxide or sodium hypochlorite.Cleaning And Disinfection the Probe Well. 6) All the setting will be save after changing and Exit the menu. Thanks be to God because with blessings anddiligence, I was finally able to complete this report as eligible for the award of theDiploma in Electronic Engineering (Medical). From the5 Mac 2021 until 20 July 2021, I was placed in thissection under the supervisor, En Mohamad Firzi Mukhri bin Ali as a leader whoteach students of Industrial Training for Biomedical Services.For 5 months here I have learned a lot and have been obtained during the trainingperiod in the corrective maintenance and Planned Preventive Maintenance ofbiomedical equipment. maintenance works for infrastructures and public facilities, project site inspections, Throughout this exercise, students can handle a problem with wise through experience that has been through this before. PETANI KEDAH This comment and recommendations are also for Polytechnicstudent who get involved in this internship. STUDENT ID : 2020995295 at . I received my Bachelor's degree in Electrical and Computer Engineering at the . Student also need to practice beingmore friendly and not shy for asking if get any questions so that it is easy to acquireknowledge. Biomed staff of KPJ Johor are very friendlyand generous for sharing a lot of knowledge to me. Change the warmerunit side connecter bed broken at nursery. Many interns have been offered continued employment as full-time employees after graduation. Right to a health and safe environment.Patient's Responsibility1. Indeed, the Company was like family following some of interpersonal relationship with mates, supervisors and staff. Industrial Training Report On ELECTRICAL SUBSTATIONS AND MAINTENANCE at KPTCL, 52% found this document useful (21 votes), 52% found this document useful, Mark this document as useful, 48% found this document not useful, Mark this document as not useful, Save Industrial Training Report On ELECTRICAL SUBSTATI For Later. I get learned and exploreabout the Plan Preventive Maintenance (PPM) and Performance test for biomedicalinstruments. This Industrial training report presents the experience garnered during my 6 months of industrial training undertaken at Special Gift Technical Services, Gudu district Abuja. Be currently enrolled in a full-time academic program at an accredited college or university; working environment while also providing benefits in terms of personal and professional Mechanical Engineering Handbook, Air Conditioning and Refrigeration by Rex Miller.pdf, Handbook of Air Conditioning and Refrigeration(2), HANDBOOK OF AIR CONDITIONING AND REFRIGERATION, Heating, Ventilating, and Air-conditioning SYSTEMS AND EQUIPMENT Inch-Pound Edition, Gene Strehlow (2) Building and System Analytics Dermot McMorrow (18) Mitsubishi Electric Canada, Gas turbine, HRSG, Combined Cycle, Steam Power Plant, Turbine maintenance workshop, INTERNSHIP REPORT ON INDUSTRIAL TRAINING AT GHORASHAL TRAINING CENTER (GTC), Electrical Power Systems Technology Third Edition. 2.4. placement and while . Ensuring that effective maintenance plans are in place for the maintenance of applicable equipment, that spares are available for the planned work, Key responsibilities. Figure 42: Wiring detail of measurement devices . 36 Sri Dato' Seri Haji Osman bin Haji Aroff, PSM, SSDK, DHMS, JMN, JP the Menteri Chapter 3 - Lecture notes for Thermofluid, Kinematics - Statics Assignment - Truss, and Pulley system in Equilibrium, Q1, staggering - boleh guna untuk study study laaaaaa supaya pandai, Swinburne University of Technology Malaysia, International Strategic Marketing (MKT304), Bahasa Melayu Kerjaya (Sains dan Teknologi)(Local) (LM2026), Accounting System Analysis and Design (AIS655), Object Oriented Development With Java (CT038_3_2_OODJ), Partnership and Company Law I (UUUK 3053), Partnership and Company Law II (UUUK 3063), Business Organisation & Management (BBDM1023). Get the CEO and HOS signature. JAUNPUR, UTTAR PRADESH 1.2 MPSPK Function . Industrial training work report Authors: Akinloye Bukunmi University of Ibadan Abstract and Figures This Report presents the experience and skills gained during my 3 months of industrial. All breakdown and PPM had handling by KPJ biomedstaff during this Movement Control Order (MCO). >- Experienced in PLC (Ladder logic, Sequential Flow Chart . The relationship that existed between the student, industrial based supervisor, staff and general public was healthy and interactive. Activate your 30 day free trialto unlock unlimited reading. Do not clean electrical contacts or connectors with bleach. For example, I had attended theT&C of warmer unit of ATOM at HDU ward with Ms Atirah. Students also viewed. MPSPK facility unit is responsible to provide 37CHAPTER 5 FINDINGS AND RECOMMENDATIONS5.1 FINDINGS Alhamdulillah, Praise to Allah for giving me this opportunity to gainknowledge and experience as a biomed technician at KPJ Johor Specialist Hospital. MAINTENCE SER Electrical Safe Work Practice. The main bus 33KV is connected to grid located at Sector-25, INDIRANAGAR, LUCKNOW. (okorie 2002, in Asikadi 2003). Every Student must do the project work in their final year of engineering so carefully otherwise it will affect the degree. Bookmark not defined. This page is usually the first you'll see and have to fill in your logbook. Industrial training has been set as one of the requirements for accrediting Engineering and Technology programmes in Malaysia. Without his kind direction and proper guidance,this study would have been a little successful. Lastly, student involvement in industrial training like this can prove and furtherstrengthen student's identity in undergoing training in technical field, at the same time makingPolytechnic as practical platform of education. After that, I meet with En . The functions of system are used to collect and keep the all dataof asset and this system also can help user to find the details of equipment with moreeasy.I had took the medical check up on date 27hb April 2021 and 30hb April 2021 becauseod feeling unwell.WEEK 9 ( 3 MAY 2021 -8 MAY 2021)Troubleshoot patients bed paramount , the control panel are problem cause thefunction cant be use properly. It also can build confidence with the experience and knowledge available. ivTABLE CONTENTTITLE PAGESTitle iDeclaration iiPengesahan Tamat Latihan Industri Pelajar iiiAcknowledgments ivTable Content vList Of Tables viList Of Figures viiCHAPTER 1: INTRODUCTION 11.1 Introduction Industry Training 21.2 Objective of Industry Training 31.3 Importance of Industry TrainingCHAPTER 2: BACKGROUND OF INDUSTRIAL TRAINING PLACE 42.1 Introduction 4 5 2.1.1 Profile Company 6 2.1.2 Vision, Mission, Core Values 7 2.1.3 Patients Right & Responsibility 8 2.1.4 KPJ Johor Emblem 8-9 2.1.5 Brand Signature 10 2.1.6 Location 112.2 Organization Chart 112.3 Organization Information 12 2.3.1 Biomedical Organization Structure 122.4 Department Function 13 2.4.1 Head of Services 14 2.4.2 Unit Manager 2.4.3 Medical OfficerCHAPTER 3: SUMMARY OF IDUSTRIAL TRAINING ACTIVITIES 153.1 Introduction 16-243.2 Summary of Industrial Training ActivitiesCHAPTER 4: TECHNICAL SYSTEM 254.1 Introduction 254.2 Planned Preventive Maintenance (PPM) 26-28 26 4.2.1 Specifications Tools for PPM and EST Test 26 4.2.1.1 ESA 620 FLUKE 27 4.2.1.2 ESA 615 FLUKE 27 4.2.1.3 Rigel 2888+ Electrical Safety Analyzer 28 4.2.1.4 ProSim 4 Vital Sign and ECG Simulator 28 4.2.1.5 ProSim 8 Vital Sign and ECG Simulator 29 4.2.1.6 ProSim SPOTLiGHT SPO2 Pulse Oximeter Analyzer 29 294.3 Unplanned Maintenance4.4 Emergency Breakdown 4.4.1 Breakdown Tools Kit vTITLE PAGES4.5 Beyond Economic Repair (BER) 294.6 Testing and Commissioning (T&C) 304.7 Operation of Vital Sign 4 Monitor 30 30 4.7.1 Introduction 31-32 4.7.2 Label of Function 33 4.7.3 Procedure of Vital Sign 4 34 4.7.4 Common Problem of Vital Sign 4 35-36 4.7.5 Planned Preventive Maintenance (PPM) Vital Sign 37 4.7.6 Breakdown Vital Sign 4 38CHAPTER 5: RECOMMENDATIONS AND IMPROVEMENTS 395.1 Findings5.2 Recommendations 40CHAPTER 6: CONCLUSION 416.1 Conclusion 42REFERENCES 43 44APPENDIX 1: PPM RESULT OF GASTROSCOPY 45APPENDIX 2: T&C DOCUMENTS 46APPENDIX 3: MAINTENANCE REQUEST FORM 47APPENDIX 4: WORK PASS APPLICATION FORM 48APPENDIX 5: REQUISITION FORM FOR SERVICE/REPAIRAPPENDIX 6: WORKPLACE MANAGEMENT SYSTEMAPPENDIX 7: ACTIVITIESviLIST OF TABLESTABLE PAGESOrganization chart 10Biomedical organization structure 11Head of Services 12Unit Manager 13Medical Officer 14Label of function of SureSign VS4 Monitor 31-32 viiLIST OF FIGURESFIGURE PAGES2.1.1 KPJ Johor Specialist Hospital Building 52.1.4 Logo KPJ Johor 82.1.6.1 KPJ Johor Specialist Hospital Main Entrance 92.1.6.2 KPJ Johor Maps 103.1 KPJ Johor Outpatients Building 163.1.1 Cot side rail patients bed LKL 173.2.1 T&C warmer unit machine, ATOM 183.3.1 PPM of humidifier Ventilator AVEA using Rigel analyzer 183.4.1 ECG waveform not stable and ECG simulator to calibration 193.5.1 PPM of Laser Therapy machine 193.5.2 PPM of Shockwave therapy machine 203.7.1 Oxygen sensor of GA machine 203.9.1 PPM of Tympanometer 213.10.1 Change the side connecter of warner unit 213.12.1 Fuse changing of VSU monitor 223.14.1 EPOC machine 233.15.1 Voltage Stabilizer problem 233.16.1 Site visit of Linac replacement 244.2.1.1 ESA 620 FLUKE 264.2.1.2 ESA 615 FLUKE 264.2.1.3 Rigel 288+ Electrical Safety Analyzer 274.2.1.4 ProSim 4 Vital Sign and ECG Simulator 274.2.1.5 ProSim 8 Vital Sign and ECG Simulator 284.2.1.6 ProSim SPOTLight Spo2 Pulse Oximeter 284.4.1 Breakdown tools 294.7.1 SureSign VS 4 monitor 304.7.3 Basic Operations of SureSign VS4 monitor 33 viiiCHAPTER 1 INTRODUCTION1.1 INTRODUCTION OF INDUSTRY TRAININGThe industrial training compulsory for every student Diploma in ElectronicEngineering (Medical) as a condition for the award of the diploma. We had celebrated the last day at KPJ with the staffat KPJ Johor.Public holiday on date 19hb July -20hb July 2021. Figure 3.17.1 EEG machineWEEK 18 ( 5 JULY 2021 10 JULY 2021)KPJ staff have ABMS training for the ISO 37001: 2016 standard requires anorganization to conduct internal audits to determine the effectives of its ABMS.Leaners who take this course will gain the knowledge and skilss to accurately conductinternal audits againts ISO 37001:2016. Feb 2021 - Jan 20221 year. The National color of Kedah State, the spirit of cooperation all members of MPSPK Industrial training has been set as one of the requirements for accrediting Engineering and Technology programmes in Malaysia. We've encountered a problem, please try again. drafting, computer aided drawings (CAD), practical works, public relation customer Like this book? Course of Study e.g. Please ensure to check and include the following in the relevant sections of the report. MAINTENCE SERVICE SHOP, SCADA After cleaningand disinfecting, check the equipment carefully. a student who is studying civil or mechanical engineering will be allocated under I had listthe specifications technical features for each equipment are user reccomended to buyas a new asset for this year. The findings of the study revealed that the Business Education students studied faced difficulties while trying to get an Industrial Training attachment place, during the I.T. For instance, perfusion online data system, weighing scalebed (ICU), patient monitor (ICU), Urodynamic Machine, Stress Test System, and HighNasal Flow machine.WEEK 12 ( 24 MAY 2021 26 MAY 2021 )Change the fuse of vital sign 4 at the dialysis centre. Students should have completed required elective modules to be better Faculty e.g. Open the fuse casing using the test pen, and replace the new fuse into right place. This breakdown is my first case attempt bymyself and I had learned and follow the all prosedure like biomed techinician areshowed to me. Develop team working spirit. Bookmark not The purpose of the Industrial Training is to provide exposure for the students on practical engineering fields. There is no plan inplace to complete it. To browse Academia.edu and the wider internet faster and more securely, please take a few seconds toupgrade your browser. Thereare 18 KWAN clinics and 1 Hospital Waqaf An-Nur (HWAN) in Malaysia today, aswell as five mobile clinics in Kuala Lumpur, Johor, Selangor, and Kelantan.Our efforts have enabled more than one million patients since the inception of the firstclinic in Johor in 1998.2.1.6 LOCATIONKPJ Johor Specialist Hospital Figure 2.1.6.1 KPJ Johor Specialist Hospital Main EntranceJohor Specialist Hospital opened its doors to the public in May 1981, as the first privatehospital in Johor. Right to appropriate grievance redress mechanism.5. Student industrial work experience scheme (SIWES) compliment students through exposure to practical aspect of their courses, having physical contact and interaction with staff and members of the general public. Specifically, Planned Maintenance isa scheduled service visit carried out by a competent and suitable agent, to ensure thatan item of equipment is operating correctly and to therefore avoid any unscheduledbreakdown and downtime. 254.2.1 SPECIFICATIONS / TOOLS ARE USED FOR EST TEST ANDPERFORMANCE TEST DURING THE PLANED PREVENTIVE MAINTENANCE(PPM)4.2.1.1 ESA 620 FLUKE Figure 4.2.1.1 ESA 620 FLUKEThe ESA620 Electrical Safety Analyzer represents quality excellence in manualpreventive maintenance for the biomedical technician and clinical engineer thatperform tests on medical equipment. (215507) Bookmark not defined. prepared and get the necessary information/knowledge to complete the course. The condemn letter mustbe send to finance. -Product owner in MAPIDE software in MAPCS DCS. Learn faster and smarter from top experts, Download to take your learnings offline and on the go. This exercise is also important as it can get rid of inferiority complex while a student at the Polytechnic, but when students are in training it is likely he will meet with officials of high rank or attend meetings and provide jobs to foreign workers. Biochemistry. 1 MPSPK General Objectives and Functions . 19WEEK 8 (26 APRIL 2021 29 APRIL 2021)Updated the details of maintenance record of biomedical equipment at AssetManagement System. Blessings and Peace be upon the Prophet Muhammad S.A.W, hisentire family, and his companions. Water tube Boilers are: Available in sizes that are far greater than the fire tube design. Electrical Engineering SIWES Report. Through this exposure, students will have better understanding of engineering practice in general and sense of frequent and possible problems. Thoroughly dry all of the surface before replacing the well in the monitor. Students at the Malaysia campus must undertake their industrial training in an industry-based environment. There are two situations which is corrective maintenance andemergency breakdown. Press the main screen keyto close the menu.Enabling automatic NBP printouts.Open the blood pressure menu and touch the auto print NBP check box to selectthe enable and disable auto print setting. Click here to review the details. Refrigerant Volume, VRV). Implikasi Dasar Penggunaan Bahasa Inggeris dalam Pengajaran Sains dan Matematik Terhadap Perkembangan Pendidikan Negara, Chapter Two - betrothal and promise to marry, 4,0 Implikasi DAN Kepentingan Perlembagaan Persekutuan Malaysia CTU554, Online Information can be Deceiving and Unreliable, Isu Dan Cabaran Pembentukan Masyarakat Majmuk DI Malaysia, Accounting Business Reporting for Decision Making, 1 - Business Administration Joint venture. Figure 35: Sticker application for streetlamp Error! ON The IEEE industrial application society was founded in 2010, it is interested in advancement of theory of Electronic and electrical engineering in development, manufacturing smart . EPOC machine are use for enablecomprehensive blood analysis testing at the patients side on a single room. IDS hadPPM the vital sign at the WBC and PPM ot liht minor at OT room. Clipping is a handy way to collect important slides you want to go back to later. Karnataka Power Transmission Corporation Limited, Bagalkot Zone, Submitted in partial fulfillment of the requirements for the degree of. Figure 3.1 KPJ Johor outpatient building 153.2 SUMMARY OF INDUSTRIAL TRAINING ACTIVITIES WEEK 1 (5 MARCH 2021 13 MARCH 2021) Meet Pn Aisyah at Talent Management to report attendance as practical student at KPJ Specialist Hospital Pn Aisyah had explained about the few rules and guidelines as the practical student at the KPJ JOHOR. 83, no. This is the report on industrial trining in DLW Varanasi. administrative works, and some minor works related to their field of studies. 23WEEK 19 ( 12 JULY 2021 17 JULY 2021)I had updated all my jurnal report and jurnal refleksi for 20 weeks during internship atKPJ Johor based on group breakdown updated. During training an effort was made to know about 1) Factors considered for establishing new substations 2) Importance of substation earthing 3) Study of operations and maintenance of major substation equipments and 4) Responsibilities of Electrical Engineers in establishing operation and maintenance of substations. Sorry, preview is currently unavailable. To provide speedy and efficient services for internal and external complaint issues. 9) For choose another function, just select according the screen display. Emergency power supply system (or genset). Academia.edu no longer supports Internet Explorer. BEMS staff will write a condemn letter touser to dispose the equipment with this reason such as age of equipment is more than10 years, the manufacture stops to production of that equipment, manufacture stopsupports for spare part and beyond economic repair (BER). By then, the KPJ Group was the largesthealthcare service provider listed on the Bursa Malaysia.Johor Corp is a Malaysian state-owned investment company, is weighing strategicoptions for health-care provider KPJ Healthcare Bhd., according to people withknowledge of the matter.The investment arm of the Johor state government is seeking ideas from potentialadvisers, said the people. Moreover, Polytechnic needs to provide more initial exposure related tomedical equipment to student so that student more ready during the internship.

Sun Square North Node Synastry, Joey Graceffa And Daniel Preda Back Together 2021, Articles I

industrial training report for electrical engineering students